Featured Project: Bayonne Bridge Navigational Clearance Program (BBNCP) Construction Management

GPI is providing construction management services for the $743-million Bayonne Bridge Navigational Clearance Program (BBNCP). The Bayonne Bridge is a steel arch structure, opened in 1931, which at that time was selected as the “Most Beautiful Steel Bridge” by the American Institute for Steel Construction. The bridge spans the Kill Van Kull and carries NY440 and NJ440. It became a Read More …

Project: The New NY Bridge

Tappan Zee Bridge (New NY Bridge) Design Build QA GPI as part of the team for the Tappan Zee Bridge Replacement project, is providing independent quality assurance services for design and construction. This $3.14 billion bridge replacement project involves a signature three-mile crossing over the Hudson River that when complete will be the widest bridge of that length in the Read More …