Greenman-Pedersen, Inc.

Retail/Commercial

GPI has extensive retail/rollout project experience. We have completed enclosed malls, strip malls, power centers, and stand alone stores. We understand the issues associated with retail design from schedule, timing, and delivery to adapting prototypical details and respecting the corporate brand. Our experience in this arena spans from entry level retailers to high end firms.
 
 
Cabela's
Multiple Locations Nationwide
Mechanical, Electrical, Plumbing, and Fire Protection Engineering
Multiple 180,000 sq ft retail facilities
Nine new retail stores totaling over 1.2 million sq ft of retail space and renovations to 5 stores totaling over 500,000 sq ft
Note: Store in Lacey Gateway Town Center, WA is LEED Registered
 
 
Arena Hub Shopping Center
Wilkes-Barre, PA
Mechanical, Electrical, Plumbing, and Structural Engineering
116,000 sq ft of new multiple retail facilities
 
 
NET Federal Credit Union
Olyphant, PA
Mechanical, Electrical, Plumbing, Fire Protection, and Structural Engineering
Renovation of 5,000 sq ft into banking facility 
Addition of 3-lane drive-thru with canopy
 
Fidelity Bank
Scranton, PA
Mechanical, Electrical, Plumbing, Civil, and Structural Engineering
New 5,100 sq ft bank facility with 4-lane drive-thru and 1,000 sq ft canopy
Includes 900 sq ft café inside the facility
 
Sandone Tire and Battery
Moosic, PA
Mechanical, Electrical, Plumbing, Civil, and Structural Engineering
New 6-bay, 7,500 sq ft automotive service facility with offices, waiting area, break rooms, locker rooms and parts storage
 
Maiolatesi Wine Cellars
Carbondale, PA
Mechanical, Electrical, Plumbing, Civil, and Structural Engineering
New 2-story, 7,000 sq ft winery including offices, production, and retail space