DC Central Kitchen DC Central Kitchen

GPI provided mechanical, electrical, plumbing, and fire protection engineering design for the new 36,900 sqft DC Central Kitchen office and cooking areas.

The state-of-the-art facility includes production and training cooking kitchens, a demonstration kitchen, retail café, podcast room, reception area, executive offices, operations office, dry & cold storage, prep areas, dish room, volunteer work areas, training rooms, restrooms, and other support areas on the first level. The main kitchen and training kitchen include five kitchen hoods and a comprehensive air scrubber system. The mezzanine level, which serves as DCCK’s administrative space, includes an elevator lift for ADA access, conference room, open work areas, private offices, storage areas, mother’s room, restrooms, and other support areas. The DCCK office and cooking area include an interconnecting stair. Supplemental AC was designed for IT requirements. Bipolar ionization was added to the HVAC system for COVID-19 mitigation. The project, which has achieved FitWel 3-Star certification, employs healthy design strategies, such as natural daylighting, active circulation, and wellness-oriented amenities to bolster occupant wellbeing.

The project received the following awards:

  • 2024 AIA DC Design Award in Interior Architecture
  • 2024 AIA Northern Virginia Award of Merit

Project Highlights

  • Owner/Client
    DC Central Kitchen
  • Location
    Washington, DC
  • Size
    36,900 sqft
  • Services
    Building Systems Design
    Building Systems Engineering
    Commercial Kitchen
    Construction Administration
    Electrical Engineering
    Electrical Power Redundancy
    Fire Protection Engineering
    HVAC Design
    Lighting Design
    Mechanical Engineering
    Plumbing Engineering